Highland Park, MI
Factory
45,540 SF
2016
Locate & remediate conduit blockage for installing an AT&T rate adjustable 100Mpbs Switched Ethernet circuit, avoiding costly aerial or burial installation. Mount flame retardant telecom backboard. Install a 120V AC dedicated outlet on a dedicated 15Amp circuit breaker. Install #6 ground wire bonded to a UFER Ground and terminated to a grounding bus bar for telco equipment. Pull 300’ CAT 5E CMP cable from demarc to 3rd floor MDF. Terminate, test, and label. Work with teams from the customer’s IT and carrier to test and turn up new circuit and cut over the network.