Dearborn, MI
Factory
798,795 SF
2024
Migrate a global logistics provider in-plant office from traditional WAN (Wide Area Network) to Software-Defined Wide Area Network (SD-WAN). Repair and test 6-strand fiber, 62.1 MIC MM OM1 cable from the Minimum Point of Entry (MPOE) to the Main Distribution Frame (MDF). Extend the demarcation for a new AT&T rate adjustable 1Gbps interstate-rated switched Ethernet circuit using repaired fiber cable. Rack and Stack Cisco Catalyst 8200L SD-WAN device with Wireless WAN (LTE) and Lanner Desktop Network Appliance. Work with teams from the customer’s IT and carrier to test and turn up new AT&T Dedicated Internet Access (DIA) circuit. Cut over Verizon MPLS circuit to SD-WAN.